Change date of workouts on logcard
Posted: November 16th, 2008, 10:50 am
by jodokus
I did some workouts ( 4 x 10K) on a pm3 with a wrong date. The date was january 2011. I don't want to delete the workouts. Is there any possibility to change the date of the workouts back to a normal date ?
Is there a description of the date on the logcard so i can change it there manually (with a hex editor)
thanks in advance
Posted: November 16th, 2008, 12:55 pm
by Citroen
Can't be fixed. Sorry.
I had one this week where the PM3 was set to October, so I just logged the workout manually then deleted it from the card with the LogCard Utility.
The layout of the data on the card is a trade secret of Concept2 Inc. I've asked Scott in the past if he'd publish a C structure or it, but he refused.
Posted: November 16th, 2008, 2:01 pm
by jodokus
What do you mean "log the workout manually", can I do that also and how ?
Posted: November 16th, 2008, 2:39 pm
by Citroen
jodokus wrote:What do you mean "log the workout manually", can I do that also and how ?
You can edit your lifetime metres on the PM3.
You can enter workouts on
http://www.concept2.com/sranking03/log.asp from that webpage (not just with the LogCard utility).