Change date of workouts on logcard

Please add feature and function requests for PM3 firmware, DLL/API's, and documentation here.
Post Reply
jodokus
Paddler
Posts: 2
Joined: November 16th, 2008, 10:45 am

Change date of workouts on logcard

Post by jodokus » November 16th, 2008, 10:50 am

I did some workouts ( 4 x 10K) on a pm3 with a wrong date. The date was january 2011. I don't want to delete the workouts. Is there any possibility to change the date of the workouts back to a normal date ?

Is there a description of the date on the logcard so i can change it there manually (with a hex editor)

thanks in advance

User avatar
Citroen
SpamTeam
Posts: 8059
Joined: March 16th, 2006, 3:28 pm
Location: A small cave in deepest darkest Basingstoke, UK

Post by Citroen » November 16th, 2008, 12:55 pm

Can't be fixed. Sorry.

I had one this week where the PM3 was set to October, so I just logged the workout manually then deleted it from the card with the LogCard Utility.

The layout of the data on the card is a trade secret of Concept2 Inc. I've asked Scott in the past if he'd publish a C structure or it, but he refused.

jodokus
Paddler
Posts: 2
Joined: November 16th, 2008, 10:45 am

Post by jodokus » November 16th, 2008, 2:01 pm

What do you mean "log the workout manually", can I do that also and how ?

User avatar
Citroen
SpamTeam
Posts: 8059
Joined: March 16th, 2006, 3:28 pm
Location: A small cave in deepest darkest Basingstoke, UK

Post by Citroen » November 16th, 2008, 2:39 pm

jodokus wrote:What do you mean "log the workout manually", can I do that also and how ?
You can edit your lifetime metres on the PM3.

You can enter workouts on http://www.concept2.com/sranking03/log.asp from that webpage (not just with the LogCard utility).
Dougie Lawson
61yrs, 172cm, Almost LWt (in my dreams).
Twitter: @DougieLawson

Post Reply