Help!
Ever since I downloaded the new logcard utility, my workouts are all being recorded on the wrong date on the card. Every workout seems as if it is being recorded with a date of May 13th even though my PM 4 is set with the correct time and date.
I didn't notice the date problem until today, when I noticed that I wasn't given credit for my first 5000 meter row for the Blue Moon Challenge.
Meter/Logcard Recording Wrong Dates!
- ckaiserca
- 1k Poster
- Posts: 144
- Joined: June 21st, 2007, 1:04 pm
- Location: Aurora, ON CANADA
- Contact:
Meter/Logcard Recording Wrong Dates!
Started with my Model D on June 11, 2007
M 46 6'2" (1.87m) 233lbs (105.9kg)
[img]http://www.c2ctc.com/sigs/img1184862882.png[/img]
Rowing for Eight Million!
M 46 6'2" (1.87m) 233lbs (105.9kg)
[img]http://www.c2ctc.com/sigs/img1184862882.png[/img]
Rowing for Eight Million!
I have reported a similar the problem with the PM4 to Concept2. The problem went away when I loaded the beta version of the firmware into the PM4. It was happening on rerows for me. It may have happened on other rows too, but I was only doing rerows when I noticed the problem.
500 1:27.9 1K 3:13.6 4m 1202 2K 6:49.4 5K 18:48.6 6K 22.25.0 30m 7777 10K 37.38.4 M/2 1:22:15.0 M 2:51.03.1